Page Hero
March 31, 2022

Sempra advances energy 安全 with TotalEnergies

<证券交易委员会tion class="证券交易委员会tion show-page-title">
Submitted by fp-admin on

乌克兰战争给欧洲带来了自二战以来从未见过的人类苦难, while also emphasizing the critical role of energy 安全 in overall economic and social wellbeing. Among other takeaways from the conflict, 人们呼吁加强协调与合作,以支持欧洲对可靠获取多种清洁能源的需求.

With last week’s energy accord between the U.S. and the European Com任务, 像totalenergy和Sempra这样的主要能源公司之间的联盟对跨大西洋贸易越来越重要, energy 安全 and environmental progress. With Sempra’s broad portfolio of liquefied natural gas (液化天然气) 出口 projects in operations and development 在北美,我们处于独特的地位,以推进安全访问美国.S. 液化天然气 for our allies abroad.

Leveraging U.S. natural gas

Working in concert with strong counterparties, Sempra在建设促进能源多样化的21世纪能源网络方面发挥着关键作用, 安全, 为世界各地的消费者提供弹性和负担得起的清洁能源.

美国.S. Energy Information Administration projects U.S. 液化天然气 出口s will reach 11.预计到2022年将达到40亿立方英尺/天,约占全球液化天然气需求的22%. At CERAWeek in 休斯顿, 液化天然气 took center stage.

“Earlier this month, CERAWeek的一个关键收获是,欧洲和亚洲迫切需要更多的液化天然气,” Justin Bird, chief executive officer of Sempra Infrastructure. 他说:“人们关注的焦点是能源供应安全问题.S. is well positioned to help solve that challenge.”

Sempra and TotalEnergies expand strategic alliance

This week, Sempra and TotalEnergies announced that Sempra Infrastructure, a subsidiary of Sempra, 和totalenergy正在通过一份不具约束力的谅解备忘录(MOU)来扩大他们的北美战略联盟 Vista Pacífico 液化天然气 出口 facility in Topolobompo, 墨西哥. 根据谅解备忘录,total energy将承包墨西哥西海岸正在开发的液化天然气设施约三分之一的长期出口产量, 以及道达尔能源作为该项目的少数股权投资者的潜在参与. 谅解备忘录还考虑在北美的几个可再生能源项目上进行合作.

Sempra Infrastructure和totalenergy已经是两个合资项目的合作伙伴:Cameron 液化天然气, a 12-Mtpa 液化天然气 出口 facility operating in Hackberry, Louisiana; and Energía Costa Azul (ECA) 液化天然气 Phase 1, 下加利福尼亚州正在建设一个约300万吨/年的液化设施, 墨西哥.

“在过去的几年里,total energy已经成为美国天然气的主要出口商.S. 在美国,液化天然气和可再生能源项目开发了令人印象深刻的管道.S.,” Bird. “将我们在Cameron 液化天然气和ECA 液化天然气一期的战略联盟扩展到西海岸的第三个液化天然气项目,凸显了Sempra Infrastructure的差异化战略,即为客户提供直接将液化天然气输送到大西洋和太平洋地区的选择.”

Vista Pacífico液化天然气项目预计将是一个中等规模的设施,将从二叠纪盆地采购低成本天然气,出口到高需求市场, including Asia, Europe and South America, 并满足墨西哥其他地区的天然气需求.

In 2020, TotalEnergies acquired a 16.6% equity stake in ECA 液化天然气 Phase 1, which is under construction, 并签署了一份20年的买卖协议.每年700万吨液化天然气(Mtpa)来自出口设施. Cameron 液化天然气, developed by Sempra, is jointly owned by affiliates of Sempra Infrastructure, TotalEnergies, 三井 & Co. 有限公司., and Japan 液化天然气 Investment, 有限责任公司, 这是一家由三菱公司和日本裕森株式会社共同拥有的公司.

Working together to advance a better future for all

伟大的 global challenges 只有当世界各地的公共和私营企业围绕一个集体目标联合起来时,才能克服这些困难. 我们都必须尽自己的一份力量,通过对可再生能源和可再生能源的战略投资,改善能源安全和推进气候目标 natural gas. 我们本周宣布的与TotalEnergies的合作对于支持未来世界能源生态系统的转型至关重要. At Sempra, we think the U.S. 在改善欧洲能源安全以及发达和新兴经济体的整体可持续性方面可以发挥重要作用.

 


 

本文包含的陈述构成1995年《英国最大赌博365网站》意义上的前瞻性陈述. 前瞻性陈述是基于对未来的假设, involve risks and uncertainties, and are not guarantees. 未来的结果可能与任何前瞻性陈述中所表达的有重大差异. 这些前瞻性陈述仅代表我们在本文发布之日的估计和假设. 我们不承担因新信息而更新或修改任何前瞻性陈述的义务, future 事件 or other factors.

In this article, 前瞻性陈述可以通过“相信”等词来识别,” “expects,” “intends,” “anticipates,”“计划,” “estimates,” “projects,” “forecasts,” “should,”“可以,”“会,”“会,” “confident,”“可能,”“可以,” “potential,” “possible,” “proposed,” “in process,” “under construction,” “in development,” “opportunity,” “target,” “outlook,” “maintain,” “continue,“”的目标,“”的目标,” “commit,” or similar expressions, or when we discuss our guidance, priorities, 策略, 目标, 愿景, 任务, opportunities, projections, intentions or expectations.

因素, among others, 可能导致实际结果和事件与任何前瞻性陈述中描述的重大差异的风险和不确定性包括:加州野火, 包括我们可能被判对损害负责的风险,无论过失如何,我们可能无法从保险中收回全部或大部分费用, 加州议会第1054号法案设立的野火基金, in rates from customers or a combination thereof; decisions, investigations, regulations, 签发或撤销许可证和其他授权, renewals of franchises, 以及(i)加州公用事业委员会(CPUC)的其他行动, Comisión Reguladora de Energía, U.S. Department of Energy, U.S. Federal Energy Regulatory Com任务, Public Utility Com任务 of 德州, 以及其他监管机构和政府机构以及(ii)国家, 县, cities and other jurisdictions in the U.S., 墨西哥 and other countries in which we do business; the success of business development efforts, construction projects and acquisitions and divestitures, 包括以下风险:(i)作出最终投资决定的能力, (二)按期、按预算完成建设工程或者其他交易的, (iii)如果这些努力完成,实现预期收益的能力, (四)取得合作伙伴或其他第三方的同意或批准, including 政府ernmental entities and regulatory bodies; the resolution of civil and criminal litigation, regulatory inquiries, investigations and proceedings, arbitrations, and property disputes, including those related to the natural gas leak at Southern California Gas Company’s (SoCalGas) Aliso Canyon natural gas storage facility; changes to laws, 包括对墨西哥宪法的修改,这可能会严重限制进入发电市场,以及对墨西哥贸易规则的修改,这可能会严重限制我们的进口能力, 出口, transport and store hydrocarbons; failure of foreign 政府ernments and state-owned entities to honor their contracts and commitments; actions by credit rating agencies to downgrade our credit ratings or to place those ratings on negative outlook and our ability to borrow on favorable terms and meet our debt service obligations; the impact of energy and climate policies, legislation and rulemaking, as well as related 目标 set, and actions taken, by companies in our industry, including actions to reduce or eliminate reliance on natural gas generally and any deterioration of or increased uncertainty in the political or regulatory environment for California natural gas distribution companies and the risk of nonrecovery for stranded assets; the pace of the development and adoption of new technologies in the energy 证券交易委员会tor, 包括那些旨在支持政府和私人政党能源和气候目标的项目, and our ability to timely and economically incorporate them into our business; weather, natural disasters, pandemics, accidents, equipment failures, explosions, acts of terrorism, 信息系统中断或其他影响我们运作的事件, damage our facilities and systems, cause the release of harmful materials, 引起火灾或使我们对财产损失或人身伤害承担责任, fines and penalties, some of which may not be covered by insurance, may be disputed by insurers or may otherwise not be recoverable through regulatory mechanisms or may impact our ability to obtain satisfactory levels of affordable insurance; the availability of electric power and natural gas and natural gas storage capacity, including disruptions caused by failures in the trans任务 grid or limitations on the withdrawal of natural gas from storage facilities; the impact of the COVID-19 pandemic, including potential vaccination mandates, on capital projects, regulatory approvals and the execution of our operations; cyber安全 threats to the energy grid, storage and pipeline infrastructure, information and systems used to operate our businesses, 我们的专有信息以及客户和员工的个人信息的保密性, 包括对我们的系统、第三方供应商的系统以及与我们开展业务的其他方的系统的勒索软件攻击, 在地缘政治事件和其他不确定性的情况下,所有这些都可能变得更加明显, such as the conflict in Ukraine; the impact at San Diego Gas & Electric Company (SDG&E)由于分布式和本地发电的增长,有竞争力的客户价格和可靠性, 包括由于客户转移到社区选择聚合直接访问而导致的零售负荷下降, and the risk of nonrecovery for stranded assets and contractual obligations; Oncor Electric Delivery Company 有限责任公司’s (Oncor) ability to eliminate or reduce its quarterly dividends due to regulatory and 政府ernance requirements and commitments, including by actions of Oncor’s independent directors or a minority member director; volatility in foreign currency exchange, inflation and interest rates and commodity prices, including inflationary pressures in the U.S., 以及我们有效对冲通胀和利率风险的能力, the impact on SDG&E’s and SoCalGas’ cost of capital and the affordability of customer rates; changes in tax and trade policies, laws and regulations, 包括可能增加我们成本的关税和国际贸易协定的修订, reduce our competitiveness, or impair our ability to resolve trade disputes; and other uncertainties, 其中一些可能很难预测,我们无法控制.

这些风险和不确定性将在Sempra提交给美国环保局的报告中进一步讨论.S. Securities and Exchange Com任务 (SEC). 这些报告可在证券交易委员会网站上通过EDGAR系统免费获得。 证券交易委员会.政府, and on Sempra’s website, salamzone.com. 投资者不应过分依赖任何前瞻性陈述.

Sempra Infrastructure, Sempra 液化天然气, Sempra 德州 Utilities, Oncor and Infraestructura Energética Nova, S.A.P.I. de C.V. (IEnova)和加州公用事业公司SDG不一样&E or SoCalGas, and Sempra Infrastructure, Sempra 液化天然气, Sempra 德州 Utilities, Oncor and IEnova are not regulated by the CPUC.

本文中所引用的网站都不是有效的超链接, and the information contained on, or that can be accessed through, any such website is not, and shall not be deemed to be, part of this document.

<证券交易委员会tion class="row region region-footer-sempra">